Solutions / Cost Optimization
Nexma's optimization engine minimizes material usage, cable lengths, and equipment counts while maintaining full compliance — delivering networks that cost less to build and operate.
25%
Average cost reduction
30%
Less cable deployed
<28dB
Guaranteed optical budget
Capabilities
Mathematical optimization finds the lowest-cost network topology that still meets all performance and compliance requirements.
Import existing conduits, poles, and ducts. The routing engine prioritizes existing infrastructure at 70% lower cost per meter.
AI selects optimal splitter ratios (1:4 to 1:32) per closure based on subscriber density, minimizing unnecessary port capacity.
Intelligent bundling reduces parallel cable runs on the same street segment, cutting material and labor costs.
Automatic BoQ generation with line-item cost breakdowns for materials, labor, and civil works.
Generate and compare multiple design variants to find the optimal balance between cost, speed, and quality.
How It Works
Step 01
Load existing ducts, poles, and conduits to maximize reuse opportunities.
Step 02
MIP engine finds minimum-cost equipment placement and cable routing.
Step 03
Review cost breakdowns across multiple architecture options side by side.
Step 04
Download detailed BoQ with material, labor, and total cost estimates.
Operators using Nexma reduce average network build costs by 25% through intelligent optimization.